The Cold Wall Pilot – For Housing Associations, Local Authorities & ALMOs

Damp and mould in social housing: treating the cold walls behind it.

For social landlords – cold walls create condensation, and condensation creates complaints. Heat Halo is a targeted thermal treatment designed to increase internal wall surface temperatures on condensation-prone walls in occupied homes.

Installed by trained Heat Halo installation teams in three days, with minimal disruption to residents.

A practical first step. Not a major capital programme.

Target the worst-performing walls first · Minimal resident disruption · Occupied-home installation · Evidence before wider deployment

Discuss the Cold Wall Pilot

The Problem

Cold walls are behind most persistent damp and mould complaints.

When internal wall surfaces drop below dew point, condensation forms. Mould follows. Cleaning, ventilation improvements and resident engagement programmes provide temporary relief – but if the wall surface temperature doesn't improve, the problem returns.

This is increasingly a compliance issue. Awaab's Law is changing the regulatory expectation on social housing providers to demonstrate effective intervention – not just reactive response.

Cold walls, damp and mould under Awaab's Law →

Repeat mould complaints

The same walls. The same properties. The same residents. Mould returns because the underlying cold wall problem hasn't been addressed.

Awaab's Law pressure

Regulatory expectations are tightening. Social housing providers need to show they are responding to damp and mould with effective, evidenced interventions – not just remediation.

Disrepair and complaint risk

Cold walls, condensation and mould generate formal complaints, disrepair claims and reputational exposure that consume disproportionate resource across the sector.

Resident wellbeing

Cold, damp rooms directly affect resident health and comfort. Warmer wall surfaces improve habitability – and resident satisfaction – in the properties that need it most.

The Intervention

The Cold Wall Pilot – one wall, one price

A single, well-defined scope. Transparent, fixed prices from first pilot to portfolio rollout.

Pilot price

One treated wall

£2,995

per wall up to 12m², ex VAT – 5‑wall Cold Wall Pilot

  • One wall up to 12m²
  • Installation of a 2mm Heat Halo thermal treatment
  • Three-day installation programme
  • Installed by a trained two-person Heat Halo installation team
  • Quality assurance documentation
  • Ready for your finishing teams

Installation only: no remedial work, wall preparation, skim or decoration included. Property remains occupied. Your existing contractors prepare the wall beforehand and complete finishing works afterwards.

Stage Per wall Total
Cold Wall Pilot – 5 walls£2,995£14,975
Expanded pilot – 15 walls£3,195£47,925
Programme – 50 walls£3,195£159,750
Portfolio rollout – 200+ walls£3,195from £639,000

All prices are per wall up to 12m², exclude VAT and are fixed for two years from contract, then reviewed.

What this buys you

An independently evidenced thermal intervention on a condensation-prone wall, installed without disrupting the resident, in a defined time frame, with full QA documentation – and finishing works retained within your existing contractor relationships.

What it is not

A major capital programme. A whole-house retrofit project. A works package that requires residents to move out, rescheduling contractors, or committing to large-scale spend before you have evidence that the intervention works in your stock.

Compare the entry point

Insulating the walls of five homes the conventional way costs about £51,000 with internal wall insulation, or £116,500 with external wall insulation, at average delivered costs under the Social Housing Decarbonisation Fund.

A 5-wall Cold Wall Pilot gives you performance evidence, resident feedback and QA documentation for £14,975.

Sources: DESNZ, SHDF Wave 2.1 Process Evaluation, August 2025 (internal, £10,200 each); Inside Housing, 17 September 2025 (external, £23,300 each).

Typical Applications

Where Heat Halo is most effective.

These are often the locations where mould repeatedly returns despite cleaning, decoration, ventilation improvements and resident engagement programmes.

End-terrace properties

Exposed gable walls with high condensation risk and limited capacity for external intervention.

Gable walls

Often the coldest surfaces in the property, particularly at first-floor and above.

Corner bedrooms

Two exposed external walls create persistent cold spots and elevated damp risk, especially in solid-wall construction.

Top-floor rooms

Cold bridging through roof junctions and parapet walls creates recurring mould at high-level wall surfaces.

Solid-wall construction

Pre-1920 and inter-war stock with no cavity – solid walls conduct cold directly to the internal surface without an insulation break.

Persistent condensation complaints

Properties where multiple rounds of remediation have not resolved the underlying condensation problem.

Why Start with Individual Walls?

A lower-risk entry point. A faster evidence pathway.

Housing associations, local authorities and ALMOs can pilot the intervention on the walls that matter most – without committing to a full retrofit programme before the evidence exists to support it.

Target the worst first

Identify the condensation-prone walls generating the most complaints and intervene there – before deciding on wider deployment.

Minimal resident disruption

Three-day programme in an occupied home. Residents do not need to move out or vacate rooms for extended periods.

Retain control of finishing works

Heat Halo installs the thermal treatment only. Your existing contractors handle any remedial work and wall preparation beforehand, and skim and decoration afterwards – keeping your supply chain relationships intact.

Evaluate before scaling

Gather real-world performance data, resident feedback and operational evidence before committing to a larger programme.

Build an internal business case

QA documentation, thermal performance evidence and resident outcomes provide the evidence base for sign-off on wider deployment.

Respond to Awaab's Law

Demonstrate a structured, evidenced response to persistent damp and mould complaints – rather than repeated reactive remediation.

How It Compares

Where targeted thermal intervention fits.

Every damp and mould response addresses part of the problem. The Cold Wall Pilot is the option that raises cold wall surface temperatures with negligible space loss and minimal disruption.

InterventionTypical useHumidityCold surfaceInternal spaceDisruption
Mould treatmentSymptom managementNoNoNoneLow
PIVHumidity managementYesNoNoneLow
Infrared heatingLocalised comfortNoTemporaryNoneLow
Internal wall insulationSignificant upgradeNoYesSignificantHigh
External wall insulationWhole-building upgradeNoYesNoneMedium
The Cold Wall PilotLocalised cold wall treatmentNoYesNegligibleLow

The Cold Wall Pilot targets the cold surface directly, with negligible loss of internal space – the practical gap between symptom management and whole-wall insulation.

Independent Performance Evidence

What the independent test showed.

Heat Halo has been independently evaluated under BS ISO 9869-1 using treated and untreated rooms on the same solid-wall property.

~25% Projected improvement in heat loss for older solid-wall stock
For a wall starting at 2.0 W/m²K, common in pre-1940 social housing – using the more conservative of BTS's two readings
+2–3°C Coated surface warmer than the wall beneath it
BTS engineer's analysis of monitoring data – across 9 days of post-treatment monitoring
16% Measured reduction in heat loss on the independently tested wall
The test property was a better-performing wall than typical HA stock – older stock will typically show more
BS ISO
9869-1
Independent in-situ test standard
Untreated control room on the same wall held steady throughout – not a lab test
Review full test methodology →
BTS heat flux sensor test setup at Binfield, Berkshire – independent ISO 9869-1 thermal testing of Heat Halo system

Tested at Binfield, Berkshire. Build Test Solutions Ltd, 24th April 2026. Untreated control room on the same wall held steady throughout the 18-day test period.

Year-Round Comfort

Warmer walls in winter – and a more stable surface through summer.

The primary benefit is warmer internal wall surfaces that reduce condensation risk through the colder months. Because the same thin thermal layer improves the wall's overall performance, the Cold Wall Pilot is also measuring how a more stable internal surface behaves during summer heat.

Winter

Warmer wall surfaces move the internal face further above dew point – directly reducing condensation risk.

Summer

A more stable internal surface temperature, buffered from external heat – being measured across the pilot.

Year-round thermal comfort is an active measurement area within the pilot, not a fixed performance claim.

Measured, Not Anecdotal

What the pilot measures.

Every wall is baselined before installation and monitored on a defined schedule, so outcomes are evidenced rather than assumed.

Baseline assessment

Construction type, orientation, heating and occupancy – plus surface and air temperatures, relative humidity, moisture readings, thermal imaging and resident feedback.

Monitoring schedule

Readings captured at baseline, then 1, 3, 6 and 12 months – tracking surface temperatures, humidity, moisture, thermal imagery, resident feedback and complaint history.

Installation Programme

Three days. One wall. Resident remains in the property.

The Cold Wall Pilot is designed for occupied homes. The programme is structured around minimising disruption while maintaining quality assurance throughout.

Protection and masking

The installation team protects the room and masks surrounding surfaces, on a wall already prepared by your contractors. No structural works required.

Thermal treatment installation

Controlled installation of a 2mm Heat Halo thermal treatment directly onto the cold wall surface.

QA documentation and handover

Quality assurance records completed and handed to your organisation. Ready for finishing works by existing contractors.

Heat Halo – wall cross-section OUTSIDE Existing solid brick wall ~225 mm · untouched substrate Interior room Space fully preserved · resident remains in home INSIDE Heat Halo thermal treatment min. 2mm wet film Ready for HA finishing teams ~2 mm thermal treatment No skirting removal · No window reveal rebuilds · No resident relocation Layer widths are illustrative – not to scale

The Cold Wall Pilot

Start with 5 walls. Build the evidence. Scale when ready.

Heat Halo is designed to be piloted first, allowing social housing providers to validate performance, resident outcomes and operational delivery before committing to wider programmes.

Recommended scope

5

Pilot walls, selected from the worst-performing locations in your stock – typically gable ends, corner rooms, end-terrace properties or persistent mould addresses.

Indicative cost

£2,995/wall

A 5-wall pilot at £14,975 provides performance evidence, QA documentation and resident outcome data – at a fraction of the cost of a traditional pilot programme.

Installation programme

3 days

Per wall. Property remains occupied. No need to rehouse residents or coordinate temporary accommodation.

Pathway to Deployment

Start small. Scale on evidence.

The Cold Wall Pilot is designed to be staged. Begin with a handful of walls, build the performance and resident-outcome evidence, and scale only when the data supports it – from a first pilot through to portfolio-wide rollout.

Stage 1 – Cold Wall Pilot

5

walls. First evidence, minimal commitment – £2,995 per wall, £14,975 in total.

Stage 2 – Expanded pilot

15

walls. Validate across property types and locations – £3,195 per wall, £47,925 in total.

Stage 3 – Programme

50

walls. Operational delivery at scale – £3,195 per wall, £159,750 in total.

Stage 4 – Portfolio rollout

200+

walls. Embedded in your asset-management strategy – £3,195 per wall, from £639,000.

What the Pilot Proves

Five outcomes the Cold Wall Pilot sets out to evidence.

Resident outcomes

Improved comfort, satisfaction and confidence that complaints are being resolved.

Damp & mould outcomes

Reduced conditions that drive condensation and mould formation.

Operational outcomes

Consistent, safe delivery in occupied homes with minimal disruption.

Strategic outcomes

Clarity on where targeted intervention sits in the damp, mould and retrofit hierarchy.

Thermal comfort outcomes

A clearer picture of year-round comfort, measured across the seasons.

Evidence for Internal Sign-Off

Every pilot generates usable evidence.

The Cold Wall Pilot is designed to generate the evidence social housing providers need for internal business case approval, regulatory assurance and wider deployment decisions.

Thermal performance evidence

Pre- and post-installation wall surface temperature monitoring confirms the improvement in treated walls. Analysis of the BTS monitoring data by BTS's engineer found the Heat Halo coated surface ran 2–3°C warmer on average than the wall surface beneath the coating.

QA documentation per wall

Full quality assurance records for each treated wall, available for Awaab's Law compliance evidence, internal audit, regulator review and future procurement decisions.

Compliance & Assurance

Designed for specification, delivery and audit.

Heat Halo is specified and delivered as a construction system – not supplied as a decorative coating. Survey, contractor approval, controlled installation and full QA documentation for every wall.

10-year installation-backed system guarantee

Pilot and programme installations are supported by a 10-year installation-backed system guarantee, subject to specification compliance, approved installation methodology and documented QA sign-off.

Trained installation teams

Installed by trained two-person Heat Halo installation teams operating to a defined installation standard – not a general contractor applying a retail product.

Documentation outputs

COSHH, method statements and QA outputs available for pilot review and internal sign-off. Evidence packaged for Awaab's Law compliance and regulatory review.

PAS 2035 alignment

Heat Halo is designed to sit within a measured, risk-managed retrofit process with Retrofit Coordinator oversight, aligned with PAS 2035 principles – for social housing providers where this is relevant to their wider retrofit strategy.

The Cost of Inaction

The real cost isn't the intervention. It's leaving the cause unresolved.

Where the underlying cold wall is never addressed, a single complaint becomes repeat inspections, repeat treatments and continued pressure on housing teams.

Repeat maintenance

Repeat inspections, mould treatments, re-decoration and ongoing contractor visits.

Resident dissatisfaction

Repeat complaints, reduced confidence in repairs and increased scrutiny from residents.

Operational pressure

Greater demand on housing officers, repairs teams and case management.

Compliance risk

Heightened scrutiny of damp and mould cases and potential escalation under Awaab's Law.

Questions

The Cold Wall Pilot: common questions.

What is the Cold Wall Pilot?

A targeted thermal treatment installed on cold, condensation-prone walls in occupied social housing. Analysis of the BTS monitoring data by BTS's engineer found the Heat Halo coated surface ran 2–3°C warmer on average than the wall surface beneath the coating. Each intervention covers one wall up to 12m², installed by a trained two-person Heat Halo installation team over three days. The property remains occupied throughout.

How much does the Cold Wall Pilot cost?

The Cold Wall Pilot is £2,995 per wall up to 12m², so a 5-wall pilot is £14,975. Expanded pilots, programmes and portfolio rollouts are £3,195 per wall: 15 walls £47,925, 50 walls £159,750, and 200+ walls from £639,000. All prices exclude VAT and are fixed for two years from contract, then reviewed.

How disruptive is the installation for residents?

Minimal. The property remains occupied throughout the three-day installation programme. Heat Halo does not require removal of skirtings, window reveal rebuilds, or temporary resident relocation. Heat Halo provides the installation only: your existing contractors complete any remedial work and wall preparation beforehand, and finishing works after installation.

Which walls are most suitable for the Cold Wall Pilot?

Heat Halo is particularly suited to end-terrace properties, gable walls, corner bedrooms, top-floor rooms, solid-wall construction and locations with persistent condensation complaints or repeat mould problems – often the walls where mould repeatedly returns despite cleaning, ventilation improvements and resident engagement programmes.

More questions answered →  ·  Awaab's Law and cold walls →

Next Step

Discuss the Cold Wall Pilot for your stock.

Tell us about the properties and walls you're dealing with. We'll confirm suitability, outline a programme structure and provide the full technical pack.

What you'll receive

The Cold Wall Pilot Pack covers Heat Halo's technical specification, independent test results, a proposed programme structure for your stock, and the QA and evidence outputs that support internal sign-off.

  • Full independent BS ISO 9869-1 test results
  • Programme pricing for your proposed wall count
  • Installation methodology overview
  • QA documentation examples
  • Evidence outputs for Awaab's Law compliance and internal sign-off

Or email us directly:

pilots@heathalo.uk

Discuss the Cold Wall Pilot

✓ Thank you – we'll be in touch within 2 working days.

We use this information only to respond to your enquiry – no obligation, and we never sell your details. See how we handle your data in our Privacy Policy.