The Cold Wall Pilot — For Housing Associations, Local Authorities & ALMOs

Cold walls create condensation. Condensation creates complaints.

Heat Halo is a targeted thermal treatment designed to increase internal wall surface temperatures on condensation-prone walls in occupied homes.

Installed by accredited specialist contractors in three days, with minimal disruption to residents.

A practical first step. Not a major capital programme.

Target the worst-performing walls first · Minimal resident disruption · Occupied-home installation · Evidence before wider deployment

Discuss the Cold Wall Pilot

The Problem

Cold walls are behind most persistent damp and mould complaints.

When internal wall surfaces drop below dew point, condensation forms. Mould follows. Cleaning, ventilation improvements and resident engagement programmes provide temporary relief — but if the wall surface temperature doesn't improve, the problem returns.

This is increasingly a compliance issue. Awaab's Law is changing the regulatory expectation on social housing providers to demonstrate effective intervention — not just reactive response.

Repeat mould complaints

The same walls. The same properties. The same residents. Mould returns because the underlying cold wall problem hasn't been addressed.

Awaab's Law pressure

Regulatory expectations are tightening. Social housing providers need to show they are responding to damp and mould with effective, evidenced interventions — not just remediation.

Disrepair and complaint risk

Cold walls, condensation and mould generate formal complaints, disrepair claims and reputational exposure that consume disproportionate resource across the sector.

Resident wellbeing

Cold, damp rooms directly affect resident health and comfort. Warmer wall surfaces improve habitability — and resident satisfaction — in the properties that need it most.

The Intervention

The Cold Wall Pilot — one wall, one price

A single, well-defined scope. A single, transparent price.

Standard price

One treated wall

£2,995

per wall up to 12m²

  • One wall up to 12m²
  • Application of a 2mm Heat Halo thermal treatment
  • Three-day installation programme
  • Installed by accredited two-person specialist team
  • Quality assurance documentation
  • Ready for your finishing teams

No skim or decoration included. Property remains occupied. Your finishing teams complete works through existing contractors.

Pilot scale Total
5 walls£14,975
10 walls£29,950
20 walls£59,900

Multi-wall pilot pricing available. Contact us to discuss your programme scope.

What this buys you

An independently evidenced thermal intervention on a condensation-prone wall, installed without disrupting the resident, in a defined time frame, with full QA documentation — and finishing works retained within your existing contractor relationships.

What it is not

A major capital programme. A whole-house retrofit project. A works package that requires decanting residents, rescheduling contractors, or committing to large-scale spend before you have evidence that the intervention works in your stock.

Compare the entry point

A traditional 5-home pilot programme can require £80,000–£150,000 of committed spend before you have usable performance data.

A 5-wall Cold Wall Pilot gives you performance evidence, resident feedback and QA documentation for £14,975.

Typical Applications

Where Heat Halo is most effective.

These are often the locations where mould repeatedly returns despite cleaning, decoration, ventilation improvements and resident engagement programmes.

End-terrace properties

Exposed gable walls with high condensation risk and limited capacity for external intervention.

Gable walls

Often the coldest surfaces in the property, particularly at first-floor and above.

Corner bedrooms

Two exposed external walls create persistent cold spots and elevated damp risk, especially in solid-wall construction.

Top-floor rooms

Cold bridging through roof junctions and parapet walls creates recurring mould at high-level wall surfaces.

Solid-wall construction

Pre-1920 and inter-war stock with no cavity — solid walls conduct cold directly to the internal surface without an insulation break.

Persistent condensation complaints

Properties where multiple rounds of remediation have not resolved the underlying condensation problem.

Why Start with Individual Walls?

A lower-risk entry point. A faster evidence pathway.

Housing associations, local authorities and ALMOs can pilot the intervention on the walls that matter most — without committing to a full retrofit programme before the evidence exists to support it.

Target the worst first

Identify the condensation-prone walls generating the most complaints and intervene there — before deciding on wider deployment.

Minimal resident disruption

Three-day programme, occupied home, no decanting. Residents are not required to move out or vacate rooms for extended periods.

Retain control of finishing works

Heat Halo completes the thermal intervention. Your existing contractors handle skim and decoration — keeping your supply chain relationships intact.

Evaluate before scaling

Gather real-world performance data, resident feedback and operational evidence before committing to a larger programme.

Build an internal business case

QA documentation, thermal performance evidence and resident outcomes provide the evidence base for sign-off on wider deployment.

Respond to Awaab's Law

Demonstrate a structured, evidenced response to persistent damp and mould complaints — rather than repeated reactive remediation.

How It Compares

Where targeted thermal intervention fits.

Every damp and mould response addresses part of the problem. The Cold Wall Pilot is the option that raises cold wall surface temperatures with negligible space loss and minimal disruption.

InterventionTypical useHumidityCold surfaceInternal spaceDisruption
Mould treatmentSymptom managementNoNoNoneLow
PIVHumidity managementYesNoNoneLow
Infrared heatingLocalised comfortNoTemporaryNoneLow
Internal wall insulationSignificant upgradeNoYesSignificantHigh
External wall insulationWhole-building upgradeNoYesNoneMedium
The Cold Wall PilotLocalised cold wall treatmentNoYesNegligibleLow

The Cold Wall Pilot targets the cold surface directly, with negligible loss of internal space — the practical gap between symptom management and whole-wall insulation.

Independent Performance Evidence

What the independent test showed.

Heat Halo has been independently evaluated under BS EN ISO 9869 using treated and untreated rooms on the same solid-wall property.

~25% Typical improvement in heat loss for older solid-wall stock
Applied to a wall starting at 2.0 W/m²K — the kind of baseline common in pre-1940 social housing
+2–3°C Average increase in internal wall surface temperature
Measured over the 18-day post-installation period — directly relevant to condensation threshold
16% Measured reduction in heat loss on the independently tested wall
The test property was a better-performing wall than typical HA stock — older stock will typically show more
BS EN
ISO 9869
Independent in-situ test standard
Untreated control room on the same wall held steady throughout — not a lab test
Review full test methodology →
BTS heat flux sensor test setup at Binfield, Berkshire — independent ISO 9869 thermal testing of Heat Halo system

Tested at Binfield, Berkshire. Build Test Solutions Ltd, 24 April 2026. Untreated control room on the same wall held steady throughout the 18-day test period.

Year-Round Comfort

Warmer walls in winter — and a more stable surface through summer.

The primary benefit is warmer internal wall surfaces that reduce condensation risk through the colder months. Because the same thin thermal layer improves the wall's overall performance, the Cold Wall Pilot is also measuring how a more stable internal surface behaves during summer heat.

Winter

Warmer wall surfaces move the internal face further above dew point — directly reducing condensation risk.

Summer

A more stable internal surface temperature, buffered from external heat — being measured across the pilot.

Year-round thermal comfort is an active measurement area within the pilot, not a fixed performance claim.

Measured, Not Anecdotal

What the pilot measures.

Every wall is baselined before installation and monitored on a defined schedule, so outcomes are evidenced rather than assumed.

Baseline assessment

Construction type, orientation, heating and occupancy — plus surface and air temperatures, relative humidity, moisture readings, thermal imaging and resident feedback.

Monitoring schedule

Readings captured at baseline, then 1, 3, 6 and 12 months — tracking surface temperatures, humidity, moisture, thermal imagery, resident feedback and complaint history.

Installation Programme

Three days. One wall. Resident remains in the property.

The Cold Wall Pilot is designed for occupied homes. The programme is structured around minimising disruption while maintaining quality assurance throughout.

Preparation and protection

Specialist team prepares the wall surface and protects the room. No structural works required.

Thermal treatment application

Controlled application of a 2mm Heat Halo thermal treatment directly onto the cold wall surface.

QA documentation and handover

Quality assurance records completed and handed to your organisation. Ready for finishing works by existing contractors.

Heat Halo — wall cross-section OUTSIDE Existing solid brick wall ~225 mm · untouched substrate Interior room Space fully preserved · resident remains in home INSIDE Heat Halo thermal treatment ~2mm applied dry Ready for HA finishing teams ~2 mm thermal treatment No skirting removal · No window reveal rebuilds · No resident relocation Layer widths are illustrative — not to scale

The Cold Wall Pilot

Start with 5 walls. Build the evidence. Scale when ready.

Heat Halo is designed to be piloted first, allowing social housing providers to validate performance, resident outcomes and operational delivery before committing to wider programmes.

Recommended scope

5–20

Pilot walls, selected from the worst-performing locations in your stock — typically gable ends, corner rooms, end-terrace properties or persistent mould addresses.

Indicative cost

£2,995/wall

A 5-wall pilot at £14,975 provides performance evidence, QA documentation and resident outcome data — at a fraction of the cost of a traditional pilot programme.

Installation programme

3 days

Per wall. Property remains occupied. No need to rehouse residents or coordinate temporary accommodation.

Pathway to Deployment

Start small. Scale on evidence.

The Cold Wall Pilot is designed to be staged. Begin with a handful of walls, build the performance and resident-outcome evidence, and scale only when the data supports it — from a first pilot through to portfolio-wide rollout.

Stage 1 — Small pilot

5

walls. First evidence, minimal commitment — from £14,975.

Stage 2 — Larger pilot

10

walls. Validate across property types and locations.

Stage 3 — Programme

50

walls. Operational delivery at scale.

Stage 4 — Portfolio

200+

walls. Embedded in your asset-management strategy.

What the Pilot Proves

Five outcomes the Cold Wall Pilot sets out to evidence.

Resident outcomes

Improved comfort, satisfaction and confidence that complaints are being resolved.

Damp & mould outcomes

Reduced conditions that drive condensation and mould formation.

Operational outcomes

Consistent, safe delivery in occupied homes with minimal disruption.

Strategic outcomes

Clarity on where targeted intervention sits in the damp, mould and retrofit hierarchy.

Thermal comfort outcomes

A clearer picture of year-round comfort, measured across the seasons.

Evidence for Internal Sign-Off

Every pilot generates usable evidence.

The Cold Wall Pilot is designed to generate the evidence social housing providers need for internal business case approval, regulatory assurance and wider deployment decisions.

Thermal performance evidence

Pre- and post-installation wall surface temperature monitoring confirms the improvement in treated walls. The independent BTS test recorded an average 2–3°C increase in internal wall surface temperature — directly relevant to condensation threshold and damp risk reduction.

QA documentation per wall

Full quality assurance records for each treated wall, available for Awaab's Law compliance evidence, internal audit, regulator review and future procurement decisions.

Compliance & Assurance

Designed for specification, delivery and audit.

Heat Halo is specified and delivered as a construction system — not supplied as a decorative coating. Survey, contractor approval, controlled application and full QA documentation for every wall.

10-year system guarantee

Pilot and programme installations are supported by a 10-year system guarantee, subject to specification compliance, approved installation methodology and documented QA sign-off.

Accredited installation

Applied by accredited two-person specialist teams operating to a defined installation standard — not a general contractor applying a retail product.

Documentation outputs

COSHH, method statements and QA outputs available for pilot review and internal sign-off. Evidence packaged for Awaab's Law compliance and regulatory review.

PAS 2035 alignment

Heat Halo is designed to sit within a measured, risk-managed retrofit process with Retrofit Coordinator oversight, aligned with PAS 2035 principles — for social housing providers where this is relevant to their wider retrofit strategy.

The Cost of Inaction

The real cost isn't the intervention. It's leaving the cause unresolved.

Where the underlying cold wall is never addressed, a single complaint becomes repeat inspections, repeat treatments and continued pressure on housing teams.

Repeat maintenance

Repeat inspections, mould treatments, re-decoration and ongoing contractor visits.

Resident dissatisfaction

Repeat complaints, reduced confidence in repairs and increased scrutiny from residents.

Operational pressure

Greater demand on housing officers, repairs teams and case management.

Compliance risk

Heightened scrutiny of damp and mould cases and potential escalation under Awaab's Law.

Next Step

Discuss the Cold Wall Pilot for your stock.

Tell us about the properties and walls you're dealing with. We'll confirm suitability, outline a programme structure and provide the full technical pack.

What you'll receive

The Cold Wall Pilot Pack covers Heat Halo's technical specification, independent test results, a proposed programme structure for your stock, and the QA and evidence outputs that support internal sign-off.

  • Full independent BS EN ISO 9869 test results
  • Programme pricing for your proposed wall count
  • Installation methodology overview
  • QA documentation examples
  • Evidence outputs for Awaab's Law compliance and internal sign-off

Or email us directly:

pilots@heathalo.uk

Discuss the Cold Wall Pilot

✓ Thank you — we'll be in touch within 2 working days.

We use this information only to respond to your enquiry. No obligation. Your details are not shared with third parties.